Multan Metro Bus Project Inaugurated by PM Nawaz Sharif on 24th January-2017 completed with cost of 28.88 Billions Rs. its route length is??
- A. 22.5 KM
- B. 27 KM
- C. 33.5 KM
- D. 18.5 KM
Explanation
The Multan Metrobus route is approximately 18.5 kilometres long, extending through the city on a dedicated corridor. The larger figures refer to possible alternative route or project-length estimates, not the inaugurated route.