Recently CM Shehbaz inaugurates Haveli Bahadur Shah gas power plant. Capacity of this project is____________?
Correct answer: A. 760 MW
- A. 760 MW
- B. 750MW
- C. 650MW
- D. 860MW
Explanation
The Haveli Bahadur Shah power project was inaugurated with an initial generation capacity of 760 MW. Its later overall planned capacity is often reported separately, which can cause confusion with this inauguration figure.