2551. The total length of Pakistan coastline is _____________?

  • A. 570 miles(917Km)
  • B. 650 miles (1,046Km)
  • C. 700 miles(1126Km)
  • D. None of these

Explanation: Pakistan’s standard coastline measurement is approximately 1,046 km, equivalent to about 650 miles. This matches option b, whereas 917 km is a different and inaccurate figure.

Correct answer: 650 miles (1,046Km)

2552. Which river flows near Moenjodaro and Larkana?

  • A. Jhelum
  • B. Chenab
  • C. Indus
  • D. Ravi

Explanation: The Indus River flows near Moenjodaro and Larkana in Sindh. Jhelum, Chenab and Ravi are eastern or northern tributaries of the Indus system and do not pass near these sites.

Correct answer: Indus

2553. Which river flow through Gilgit Baltistan?

  • A. Indus
  • B. Jhelum
  • C. Chenab
  • D. Ravi

Explanation: The Indus is the major river of Gilgit-Baltistan and passes through areas including Gilgit, Skardu and Diamer. The Jhelum, Chenab and Ravi mainly belong to the Punjab river system.

Correct answer: Indus

2554. Mohmand Dam is located at which river?

  • A. Kabul
  • B. Indus
  • C. Swat
  • D. Panjkora

Explanation: Mohmand Dam is being constructed on the Swat River in Khyber Pakhtunkhwa. Although the Swat eventually joins the Kabul River, the dam itself is located on the Swat.

Correct answer: Swat

2555. Recently inaugurated Chashma- III nuclear power plant can generate___________ megawatts of electricity?

  • A. 340 megawatts
  • B. 360 megawatts
  • C. 400 megawatts
  • D. 150 megawatts

Explanation: Chashma Nuclear Power Plant Unit-3 has a generation capacity of 340 megawatts. It is part of the Chashma nuclear power complex in Mianwali.

Correct answer: 340 megawatts

2556. PM Nawaz has inaugurated 340 MW Chashma Nuclear Project-III in Mianwali on 28 December-2016 with the help of??

  • A. China
  • B. Turkey
  • C. Russia
  • D. Canada

Explanation: China assisted Pakistan in the construction of Chashma Nuclear Project-III, reflecting Sino-Pakistani cooperation in Pakistan’s nuclear energy sector.

Correct answer: China

2557. USA have signed an agreement to provide Rs 8.5 billion to the WAPDA for the construction of?

  • A. Dia Mir Bahasha Dam Project
  • B. Kala Bagh Dam Project
  • C. Kurram Tangi Dam Project
  • D. Mirani Dam Project

Explanation: The US agreement provided funding for the Kurram Tangi Dam Project in North Waziristan. Diamer-Bhasha and Mirani are separate dam projects with different funding histories.

Correct answer: Kurram Tangi Dam Project

2558. Neelum-Jhelum Hydropower Plant based in Muzzafarabad will produce electricity?

  • A. 969 Mwt
  • B. 4500 Mwt
  • C. 425 Mgw
  • D. 3200 Mwt

Explanation: The Neelum-Jhelum Hydropower Plant near Muzaffarabad has an installed generation capacity of 969 MW. The larger figures listed are not its capacity.

Correct answer: 969 Mwt

2559. The total length of Karachi-Lahore Motorway is___________?

  • A. 1,000 km
  • B. 1,152 km
  • C. 1,200 km
  • D. 1,300 km

Explanation: The Karachi-Lahore Motorway was commonly reported in project descriptions as approximately 1,152 kilometres long. The other figures are rounded alternatives that do not match the stated project length.

Correct answer: 1,152 km

2560. The government of Pakistan is trying to add electricity generation of__________MW to national grid by 2017- 18

  • A. 10,000
  • B. 10,400
  • C. 10,800
  • D. 11,200

Explanation: The government’s target was to add about 10,400 MW of electricity-generation capacity to the national grid by 2017-18. This was part of the plan to reduce Pakistan’s electricity shortfall.

Correct answer: 10,400