Free Geography of Pakistan MCQs with Answers

577 Geography of Pakistan MCQs from Pakistan Studies, each with the correct answer and a written explanation of why it is correct. Free and unlimited, with no account needed.

Last updated

577 questions · page 41 of 58

401. Mohmand Dam is located at which river?

  • A. Kabul
  • B. Indus
  • C. Swat
  • D. Panjkora

Explanation: Mohmand Dam is being constructed on the Swat River in Khyber Pakhtunkhwa. Although the Swat eventually joins the Kabul River, the dam itself is located on the Swat.

Correct answer: Swat

402. Recently inaugurated Chashma- III nuclear power plant can generate___________ megawatts of electricity?

  • A. 340 megawatts
  • B. 360 megawatts
  • C. 400 megawatts
  • D. 150 megawatts

Explanation: Chashma Nuclear Power Plant Unit-3 has a generation capacity of 340 megawatts. It is part of the Chashma nuclear power complex in Mianwali.

Correct answer: 340 megawatts

403. PM Nawaz has inaugurated 340 MW Chashma Nuclear Project-III in Mianwali on 28 December-2016 with the help of??

  • A. China
  • B. Turkey
  • C. Russia
  • D. Canada

Explanation: China assisted Pakistan in the construction of Chashma Nuclear Project-III, reflecting Sino-Pakistani cooperation in Pakistan’s nuclear energy sector.

Correct answer: China

404. USA have signed an agreement to provide Rs 8.5 billion to the WAPDA for the construction of?

  • A. Dia Mir Bahasha Dam Project
  • B. Kala Bagh Dam Project
  • C. Kurram Tangi Dam Project
  • D. Mirani Dam Project

Explanation: The US agreement provided funding for the Kurram Tangi Dam Project in North Waziristan. Diamer-Bhasha and Mirani are separate dam projects with different funding histories.

Correct answer: Kurram Tangi Dam Project

405. Neelum-Jhelum Hydropower Plant based in Muzzafarabad will produce electricity?

  • A. 969 Mwt
  • B. 4500 Mwt
  • C. 425 Mgw
  • D. 3200 Mwt

Explanation: The Neelum-Jhelum Hydropower Plant near Muzaffarabad has an installed generation capacity of 969 MW. The larger figures listed are not its capacity.

Correct answer: 969 Mwt

406. The total length of Karachi-Lahore Motorway is___________?

  • A. 1,000 km
  • B. 1,152 km
  • C. 1,200 km
  • D. 1,300 km

Explanation: The Karachi-Lahore Motorway was commonly reported in project descriptions as approximately 1,152 kilometres long. The other figures are rounded alternatives that do not match the stated project length.

Correct answer: 1,152 km

407. The government of Pakistan is trying to add electricity generation of__________MW to national grid by 2017- 18

  • A. 10,000
  • B. 10,400
  • C. 10,800
  • D. 11,200

Explanation: The government’s target was to add about 10,400 MW of electricity-generation capacity to the national grid by 2017-18. This was part of the plan to reduce Pakistan’s electricity shortfall.

Correct answer: 10,400

408. International Court of Arbitration sets minimum flow of __________ m3/sec into the Neelum River.

  • A. 5
  • B. 7
  • C. 9
  • D. 11

Explanation: In the Kishanganga arbitration, the Court allowed India’s diversion project but required a minimum flow of 9 cubic metres per second into the Neelum River. This condition was intended to preserve downstream environmental needs.

Correct answer: 9

409. The Installed Capacity of Neelum-Jhelum Hydropower Plant is __________ MW?

  • A. 948
  • B. 955
  • C. 962
  • D. 969

Explanation: The Neelum-Jhelum Hydropower Project has an installed generation capacity of 969 MW. It diverts Neelum River water through tunnels to a power station near Muzaffarabad.

Correct answer: 969

410. Diamer-Bhasha Dam has been planned on the river _________?

  • A. Indus
  • B. Jhelum
  • C. Chenab
  • D. Sutlej

Explanation: Diamer-Bhasha Dam is planned on the Indus River in Gilgit-Baltistan. The Indus is Pakistan’s principal river and supports the country’s largest irrigation system.

Correct answer: Indus